Mini 1/2/3KG melting furnace melting induction for GOLD

PRODUCT DETAIL
Keyword:Melting Furnace;Brand Name:OEM Melting Furnace;
Place of Origin:China;Machinery Test Report:Provided;
After Warranty Service:Video technical support;Warranty:1 Year;
Type:Induction Furnace;Supply Ability:10000 Sets per Month heat press machine sets;
Dimension(L*W*H):customizable;Weight (T):0.01 T;
Packaging Detail:Carton and foam well packed. For large quantity, we will pack in pallet. Melting Furnaces;Key Selling Points:Competitive Price;
Power (kW):1.4;Voltage:110V/220V;
Usage:Melting Furnace;Core Components:Motor;
Payment Terms:Western Union,D/P,D/A,T/T,MoneyGram,PayPal;Condition:New;
Marketing Type:New Product 2020;Product Name:Copper, Gold, Induction Electric Jewelry Melting Furnace;
Applicable Industries:Machinery Repair Shops,Retail,Construction works ;Warranty of core components:1 Year;
Port:Shanghai;Showroom Location:None;
Video outgoing-inspection:Provided;

Mini 1/2/3KG melting furnace melting induction for GOLD

Voltage: 220V/110V

Power: 1400-1700W

Capacity: 1kg/2kg/3kg

Weight: 9kg  /  12KG

packing size: 45*30*30cm

Maximum temperature  220V/110V 1100° C  

accessories: one tong, one crucible,and one power cord cable

 

melted metal: Aluminum, Copper, Gold, Lead, Silver, Sterling Silver, Tin & Zinc

Gold meltingf furnace working instructions:

1. will melt gold machine put smoothly

2. and carefully examine whether products,then will cover intact,dissolve gold open check whether the vessel intact

3. connecting swith power supply,electrictity,light switch

4. and the normal work,intelligent temperature controller with the digital furnace temperature and slowly rising,if there are any complicatios,be sure to stop using it,

5. in the process of operation,the furnace temperaturedegrees will spread,staff shall not move and collision,avoid scald and damage

6. in june,when the temperature reached gold and gold rains melring point,staff according to demand will continue to increase.when the maximum temperature reached 1,100 degrees in 28°C,will stop work or in cooling condition

7. gold,be sure to disconnect the power supply,then use to operate,go profssional pliers to ensure their safety

8. and shall immediately take gold after moving machines,owing to the high temperature,can easily damaged internal components,and burns itself to its cooling,10-20 minutes,to ensure the service life of the products

9. Every time interval must be in 30-60 minutes,very easy to damage the product

10. For precision machine,please dont remove the professional technology,to ensure accuracy

11. Please pay attention to safety and maintain normal use of machine

VIEW MORE